Questions. Answers about kits, costs and permits.
Call 208-907-7264 if yours isn't here.
Every question.
How much does an ADU cost in Washington?
Our ADU kits start at $58,123. Delivery is priced by distance from Post Falls, Idaho. You will also need a foundation and an assembly crew.
How does Kit Culture financing work?
You can finance up to $250,000, with $0 down through $100,000 and terms up to 144 months. The loan is secured by a UCC-1 filing on the structure, not a lien on your home, so there is no new mortgage and no appraisal. Most complete applications get a decision the same day or the next.
Can I finance a build on vacant land?
Yes. Kit financing works on raw land with no existing structure, and the first payment is not due until 45 days after closing. Loans are available in Idaho, Washington, Montana, Wyoming, Nevada, Arizona, Utah, Colorado and Texas.
Do I need a contractor?
That part is up to you. The kit shows up pre-cut, labeled, and with assembly instructions, so an owner-builder or a general crew can put it together. Licensed trades should handle the plumbing and electrical install, even though the materials ship with the kit, and you or your builder take care of the foundation, site work, and permits. If you would rather not manage any of it, our preferred builder page is the place to start.
Can I see a Kit Culture home in person?
Yes. The model home at 543 N Wylder Loop in Post Falls, Idaho is open most days from 9 to 5. It is self-guided, so no appointment is needed.
What is in the kit?
Precut, labeled wood framing, the steel roof and siding, Milgard windows, doors and trim, smart kitchen appliances, quartz countertops, cabinets, heating and cooling, flooring, plumbing and electrical fixtures, and stamped engineering drawings.
What is not included?
The foundation, plus paint, stain and caulking. Drywall is sourced locally: it is included within 30 miles of an approved supplier, otherwise it comes off the kit price.
How is the kit delivered?
The kit ships from Idaho, with two hours of unloading labor. Delivery is priced by distance from Post Falls, Idaho. The designer works out the cost from your address.
How long does it take to build?
Most homes are finished within 90 days of the kit arriving. Your builder and site conditions set the actual schedule.
Where are the ADU plans pre-approved?
Renton, Leavenworth, Wenatchee, East Wenatchee, Seattle, Kirkland, Bainbridge Island, Bremerton, Kitsap County, Port Orchard, Poulsbo, Bellingham, Port Angeles, Everett and Tacoma. Each plan page lists where that plan is pre-approved. Every kit comes with stamped engineering drawings and assembly guides.
What does the warranty cover?
The standard steel roof and wall panels carry a 40-year warranty. They are 26-gauge American steel with a Sherwin-Williams coating, made in our Idaho plant.

Price a home for your land. Delivery, financing and permits for your build site.
Or visit the model home in Idaho, or call 208-907-7264.